Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5121

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 天美传媒精品 | 一本卡二卡三乱码最近更新版 | 伊人网狠狠干 | 久热久热| 一本大道无香蕉综合在线 | 色在线影院 | 狠狠综合欧美综合欧美色 | 欧美香蕉 | 久久久婷婷亚洲5月97色 | 2021久久伊人精品中文字幕有 | 欧美影视一区二区三区 | 99久久国产综合精品五月天 | 亚洲免费播放 | 日本亚洲精品成人 | 日韩欧美国产偷亚洲清高 | 9久9久女女热精品视频免费观看 | 欧美亚洲网 | 四虎影院新网址 | 国产精品一区二区国产 | 欧美日韩国产一区二区三区不卡 | 久久久久久国产精品mv | 精品国内一区二区三区免费视频 | 美国做受三级的视频播放 | 色综合天天综合网站中国 | 拍拍叫痛的无挡视频免费 | 欧美做a欧美 | 一区二区免费在线观看 | 日日做日日摸夜夜爽 | 三级a毛片 | 99午夜高清在线视频在观看 | 色妞www精品视频免费看 | 亚洲日本高清 | 日本阿v精品视频在线观看 日本xxxxx高清免费观看 | 2020久久 | 在线视频三区 | 国产在线综合视频 | 免费国产一级特黄久久 | 色婷婷成人网 | 香蕉视频在线观看网站 | 好男人影视神马在线www | 九九热在线播放 |