欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Olympic Sports Center Gymnasium on the 15th completed Badminton will be held next month
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

Olympic Sports Center Gymnasium on the 15th completed Badminton will be held next month

Time:[2014-10-11]  Hits:5601

 As of November this year, Badminton Open venues, Olympic Sports Center Gymnasium civil Strait projects, installations and decoration has fundamentally completed, ongoing commissioning and outdoor finishing device will be officially completed on the 15th.
In another development, the main body of the intermediate structure Strait main stadium, the roof has been fundamental end devices, is conducting layer and three on the ground, watching the construction mesa layer construction and steel structure outside the walls and blind football field guide tube; indoor Swimming pool masonry masonry and paving the game has ended, pipelines, roof unit has entered during the mop-up; tennis stadium in the middle of the bottom of the construction has been completed.
In addition, in accordance with the athletes' village project completed by the end of May 2015 to promote the progress of the North Lot 22 apartments have all been capped player into during renovation.
In the county (city) district new venues, the stadium has been the end of the main construction Jinan District, the main stadium; Mawei District Stadium completed before the end of testing in accordance with the progress of the program to promote; Changle City, the main structure of the stadium construction and interior masonry wall has ended, pipeline device has entered the mop-up, ongoing interior decoration and curtain wall construction; Changle City Water base boathouse, stands, end tower main structure has ended, interior decoration and construction in progress; Minhou County Coliseum main concrete structure, grid structure and glass curtain wall structure construction has ended; Lianjiang County Coliseum in accordance with the progress of the program before the end of the completion of testing, driven by the end of the main structure has been entered during the interior decoration and construction.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 综合网在线视频 | 高清不卡免费一区二区三区 | www.100lu| 亚洲国产成人久久一区久久 | 免费jjzz在在线播放国产 | sss在线观看 | 欧美啄木乌成人系列影片 | 天堂网在线观看 | 国产精品18久久久久久久久久 | 国产精品日韩在线观看 | 久热这里 | 91香蕉视频在线观看 | 国产成人综合91精品 | 欧美视频国产 | 果冻传媒国产精品 | 日韩精品一区二区三区中文字幕 | 91天堂最新在线观看 | 国产精品毛片大码女人 | 999re6热在线精品视频思思 | 欧美日本一区二区三区生 | 日韩欧美一区二区在线 | 热久久免费视频 | 91成人国产福利 | 中文字幕曰韩一区二区不卡 | 日本韩国一级 | 日本天堂网在线观看 | 日本一区二区不卡在线 | 精品中文字幕一区在线 | 毛片基地免费视频a | 在线亚洲网站 | 麻豆国产精品入口免费观看 | 日本高清视频在线播放 | 亚洲大黑香蕉在线观看75 | 久草视频这里只有精品 | 蝴蝶传媒4.754 | 狠狠插网站 | 二级片在线观看 | 国产美女视频免费 | 花季传媒v3.037 | 亚洲精品嫩草研究院久久 | 插插操操|