欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > 1. Steel parts and steel components processing requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4742

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 国产一级毛片视频 | 欧美日本一本 | 九九热这里只有国产精品 | 欧美肥| www.四虎在线观看 | 午夜网站在线观看免费网址免费 | 欧美在线成人免费国产 | 欧美曰韩一区二区三区 | 97精品国产自在现线免费观看 | 国产理论在线 | 日本不卡视频一区二区 | 国产一区亚洲二区 | 九九精品在线观看 | 日韩免费高清视频网站 | 四虎影院官网 | 成人在线影视 | 色在线国产 | 四虎国产精品永久地址99新强 | 欧美视频一区在线观看 | 精品视频在线观看一区二区三区 | 久久99热不卡精品免费观看 | 亚洲2020天天堂在线观看 | 久碰香蕉精品视频在线观看 | 另类 欧美 视频二区 | 欧美日韩国产超高清免费看片 | 91在线免费视频观看 | 国产亚洲小视频 | 99视频国产热精品视频 | 伊人欧美 | 成人国产亚洲欧美成人综合网 | 国产日韩欧美亚洲综合 | 九九热国产精品视频 | 国产在线观看一区精品 | 国产欧美日本亚洲精品一4区 | 羞羞视频免费网站欧美 | 欧美一区二区三区视频在线观看 | 日本中文字幕不卡 | 四虎4hu影库永久地址 | 欧美性xxxxx极品视频 | 99久久精品免费视频 | 免费观看情趣v视频网站 |