欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5529

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精品综合在线 | 亚洲线精品一区二区三区 | 亚洲第一毛片 | 免费国产在线观看不卡 | 日韩精品视频免费网址 | 黄网站在线观看永久免费 | 国产一级特黄aaa大片 | 亚州一区二区 | 六月综合网 | 91热视频在线 | 黄色网页在线免费观看 | 91系列在线观看 | porn 国产| 香蕉视频网站入口 | 亚州激情视频在线播放 | 四虎影院国产精品 | 精品视频在线观看 | 色妞www精品视频免费看 | 国产一区二区福利久久 | 色花堂的网站永久地址 | 精品国产一区在线观看 | 成年片黄大全 | 中文字幕一区二区区免 | 亚洲影视一区二区 | 日韩免费一级a毛片在线播放一级 | 亚洲经典一区二区三区 | 日本一区中文字幕 | 五月婷婷网址 | 精品三级在线观看 | 亚洲最新视频在线观看 | 123日本不卡在线观看 | 亚洲欧美在线一区二区 | 黄色欧美视频在线观看 | 4hu影院永久在线播放 | 成人在线免费观看视频 | 久草99| 成人在线免费视频 | 亚洲免费成人网 | 另类久久 | 欧美午夜在线观看 | 麻豆精品在线播放 |