raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4907

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 明星三级国产免费播放 | 国产视频一区在线观看 | 色综合中文字幕天天在线 | 美国免费黄色片 | 亚洲韩精品欧美一区二区三区 | 99热这里只有精品18 | 国产精品永久免费10000 | 欧美日韩一区二区综合在线视频 | 欧美激情一区二区三区不卡 | 日本欧美一区二区三区高清 | 日本免费黄色网址 | 精品美女 | 99综合网| 亚欧乱色视频网站大全 | 久久精品亚洲一区二区 | 看一级特黄a大片日本片 | 国产一级特黄aa大片爽爽 | 亚洲日韩中文字幕 | 日韩3区| 久久金8天国| 成人午夜无人区一区二区 | 四虎永久免费地址ww417 | 久草视频在线首页 | 欧美天天干 | 男女做视频网站免费观看 | 四虎影院官网 | 乱一色一一区二区三区 | 久久精品亚洲牛牛影视 | 免费三片在线观看网站 | 久久机热综合久久国产 | 欧美激情亚洲精品日韩1区2区 | 久久久久久久999 | 精品资源在线 | 国产成人精品影视 | 日本成人a视频 | 天天色综合4 | 国产成人精品微拍视频 | 国产精品免费视频一区一 | 成人黄色毛片 | 日韩 亚洲 制服 欧美 综合 | 欧美一区二区三区不卡视频 |