Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4532

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费国产黄网站在线观看 | 日韩成人在线观看视频 | 日本丰满www色 | 亚洲精品成人久久 | 日韩精品亚洲一级在线观看 | 亚洲国产成人久久精品动漫 | 日本在线视频一区 | 国产精品91在线播放 | 视频一本大道香蕉久在线播放 | 国产福利在线免费观看 | 两个人免费观看高清视频图 | 国产精品露脸张开双腿 | 大蕉久久伊人中文字幕 | 97成人精品视频在线播放 | 国产一级黄色大片 | 男女免费视频网站 | 欧亚毛片| 狠狠色丁香久久婷婷综合丁香 | 一区二区三区四区日韩 | 久久久黄色大片 | 国产综合精品久久亚洲 | 天天操精品视频 | 日韩免费精品一级毛片 | 亚洲国产高清视频 | 天堂在线观看视频观看www | 欧美天堂在线观看 | 草久在线观看视频 | 91香蕉国产观看免费人人 | 最新91视频 | 99久久精品免费看国产麻豆 | 日韩在线免费看网站 | 亚洲人成网站在线观看播放动漫 | 成人国产一区二区三区 | 日本欧美不卡一区二区三区在线 | 天天操天天干天天操 | 特级a级毛片| 男人天堂黄色 | 91蜜桃在线观看 | 激情视频亚洲 | 国产视频首页 | 亚洲性xx |