Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4000

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本三级网站在线观看 | 99色图 | 亚洲久热| 国产在线一区二区三区在线 | 青青草精品在线 | 亚洲国产成人久久综合一区77 | 欧洲视频一区 | 三级aa久久| 大象焦伊人久久综合网色视 | 精品视频一区二区三区在线播放 | 国产成人精品一区二区三在线观看 | 亚洲日本中文 | 欧美无删减 | 中文字幕在线视频播放 | 国产一区欧美二区 | www.操操操| 欧美一本 | 日韩欧美亚洲精品 | 日韩精品中文字幕一区二区三区 | 日本黄色免费网站 | 麻豆精品在线视频 | 亚洲欧美在线不卡 | 色播艾小青国产专区在线播放 | 亚洲一级片在线观看 | 免费成人在线网站 | 日本不卡二 | 清纯唯美综合网 | 欧美日韩一区二区三区高清不卡 | 香港国产特级一级毛片 | 精品99视频 | 精品国产综合区久久久久99 | 四虎成人精品在永久在线观看 | 国产日韩视频在线观看 | 麻豆app在线观看 | 一级毛片免费全部播放 | 日韩精品免费一级视频 | 日韩第四页 | 91网站入口最新 | 大蕉久久伊人中文字幕 | 青青草原免费在线视频 | 青青伊人久久 |