欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:3463

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 自拍偷拍免费视频 | 亚洲成人综合在线 | 日韩欧美中文字幕在线视频 | 久久精品国产99久久久 | 国产视频久久久久 | 亚洲欧美日韩中文字幕在线一区 | 99午夜高清在线视频在观看 | 欧美日韩国产在线播放 | 四虎国产欧美成人影院 | 四虎影院永久网站 | 国产欧美另类久久精品91 | 久久99精品久久久久久黑人 | 91香蕉国产观看免费人人 | 日韩特级毛片免费观看视频 | 四虎精品成人免费永久 | 亚洲福利网址 | 午夜一级做a爰片久久毛片 午夜一级毛片看看 | 国产又黄又a又潮娇喘视频 国产又粗又爽又大又长免费视 | 国产成人最新毛片基地 | 99视频有精品视频免费观看 | 天天视频国产 | 国产污污视频 | 蜜柚影视免费版在线视频观看 | 久久国产精品免费视频 | 欧美中文字幕 | 日本天堂网在线观看 | 免费观看男女羞羞的视频网站 | 国产肝交视频在线观看 | 亚洲一区二区三区国产精品 | 操操操综合网 | 和日本免费不卡在线v | 狠狠噜噜 | 九九视频在线观看视频 | 麻豆免费视频 | 国产成人精品福利网站在线观看 | 在线观看日韩欧美 | 日韩在线视频网站 | 五十路亲子中出在线观看 | 99热精品成人免费观看 | 91精品国产91久久久久 | 日韩在线视频在线观看 |