欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ggscp.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2761

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 三级四级特黄在线观看 | 香蕉视频在线播放 | 91精品免费视频 | 国家免费看在线视频 | 国产午夜视频在永久在线观看 | 日日干天天操 | 成人a级特黄毛片 | 亚洲国产高清视频在线观看 | 国产高清在线观看麻豆 | 一区二区三区四区视频在线 | 欧美xx视频 | 日日噜噜夜夜狠狠视频 | 97精品国产高清在线看入口 | 蜜桃臀久久伊人福利 | 免费精品美女久久久久久久久 | 99re国产视频 | 日韩欧美精品一区二区 | 国产亚洲欧洲一区二区三区 | 欧美tv| 国产亚洲精品俞拍视频 | 国产一级毛片a午夜一级毛片 | 久久国产精品亚洲va麻豆 | 国产精品一区二区在线播放 | 蜜臀91精品国产高清在线观看 | 在线免费观看一区二区三区 | 伊人宗合| 日韩在线视频免费播放 | 亚洲这里只有精品 | 久草免费小视频 | 久久成人亚洲香蕉草草 | 欧美又硬又粗又长又大 | 97在线看 | 99热这里都是国产精品 | 在线视频久 | 国产在线一区二区三区在线 | 韩国一级片在线播放 | 99在线视频精品费观看视 | 亚洲天堂区 | 欧美精品亚洲二区 | 精品福利一区3d动漫 | 四虎www |