Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2361

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产麻豆一级在线观看 | 视频一区二区中文字幕 | 成人一区二区免费中文字幕 | 噜噜噜噜天天狠狠 | 亚洲国产精品热久久 | 久久机热这里只有精品33 | 久久er精品 | 日本成人二区 | 99久久精彩视频 | 在线一区免费视频播放 | 91三级在线 | 日韩视频在线观看一区 | 欧美成人三级 | 国产韩国精品一区二区三区久久 | 高清在线看 | 善良朋友的妻子在线观看 | 国产三级在线看 | 在线观看99 | 亚洲天堂五月天 | 久久精品国产一区二区三区 | 97在线视频网站 | 午夜视频在线免费观看 | 精品日韩一区二区三区视频 | 国产69精品久久久久妇女 | 日本a区 | 四虎精品永久在线 | 四虎影院免费视频 | 99re66热这里只有精品17 | 91av视频免费在线观看 | 日韩精品网站 | 99久久国产综合精品网成人影院 | 国产香蕉一区二区在线观看 | 日本韩国欧美在线 | 8008幸福宝app官网下载 | 精品卡1卡2卡三卡免费网站视频 | 麻豆精品视频网站在线观看 | 99视频国产在线 | 欧洲欧美人成在线视频免费下载 | 日韩欧美国产亚洲 | 在线观看国产亚洲 | 欧美精品一区二区三区在线 |
在线咨询
业务经理
客服人员1
客服人员2
客服人员3
请您留言

感谢您的关注,当前客服人员不在线,请填写一下您的信息,我们会尽快和您联系。

提交